Phantom
Carbon Shafts
Arrow Assembly Instructions
- Phantom Shafts come ready to fletch.
- Optional: Wipe with Acetone or Denat. Alcohol
- Insert Bohning Classic Nock
- Optional: Install nock bushing with Bohning Power Bond (a cyanoacrylate (C-A)
glue joint is too brittle for impact resistance and will break down
with use)
- Set shaft in fletch jig
- Set clamp for 2* angle left or 2* angle right
- Place fletch in clamp
- Place a thin line of C-A along entire fletch base
- Set clamp in position near and parallel to shaft
- Press clamp evenly toward shaft until fletch
makes solid contact along its entire length.
- Hold for ten seconds
- Remove clamp
- Repeat until shaft is fletched
- Remove shaft from jig
- Allow arrow to set for ½ to 1 hour
- Wipe fletch bases with acetone
- Cut to length with high rpm cutoff tool
- Swab inside of shaft point-end with q-tip &
acetone
- Install points with Power Bond
- Wipe excess glue with acetone
- Allow shafts to set for 10 hours
Happy
shooting,
Larry
|