Phantom Carbon Shafts
Arrow Assembly Instructions

  1. Phantom Shafts come ready to fletch.

  2. Optional: Wipe with Acetone or Denat. Alcohol

  3. Insert Bohning Classic Nock

  4. Optional: Install nock bushing with Bohning Power Bond (a cyanoacrylate (C-A) glue joint is too brittle for impact resistance and will break down with use)

  5. Set shaft in fletch jig

  6. Set clamp for 2* angle left or 2* angle right

  7. Place fletch in clamp

  8. Place a thin line of C-A along entire fletch base

  9. Set clamp in position near and parallel to shaft

  10. Press clamp evenly toward shaft until fletch makes solid contact along its entire length.

  11. Hold for ten seconds

  12. Remove clamp

  13. Repeat until shaft is fletched

  14. Remove shaft from jig

  15. Allow arrow to set for ½ to 1 hour

  16. Wipe fletch bases with acetone

  17. Cut to length with high rpm cutoff tool

  18. Swab inside of shaft point-end with q-tip & acetone

  19. Install points with Power Bond

  20. Wipe excess glue with acetone

  21. Allow shafts to set for 10 hours

Happy shooting,
Larry