Phantom Carbon Shafts
Arrow Assembly Instructions
  1. Phantom Shafts come ready to fletch.
  2. Optional: Wipe with Acetone or Denat. Alcohol
  3. Insert Bohning Classic Nock
  4. Optional: Install nock bushing with Bohning Power Bond (a cyanoacrylate (C-A) glue joint is too brittle for impact resistance and will break down with use)
  5. Set shaft in fletch jig
  6. Set clamp for 2* angle left or 2* angle right
  7. Place fletch in clamp
  8. Place a thin line of C-A along entire fletch base
  9. Set clamp in position near and parallel to shaft
  10. Press clamp evenly toward shaft until fletch makes solid contact along its entire length.
  11. Hold for ten seconds
  12. Remove clamp
  13. Repeat until shaft is fletched
  14. Remove shaft from jig
  15. Allow arrow to set for ½ to 1 hour
  16. Wipe fletch bases with acetone
  17. Cut to length with high rpm cutoff tool
  18. Swab inside of shaft point-end with q-tip & acetone
  19. Install points with Power Bond
  20. Wipe excess glue with acetone
  21. Allow shafts to set for 10 hours

Happy shooting,
Larry

Click Here for a Printer Friendly Version to Launch in a New Window

 


books coach bows resume
Assembling